top of page

How a PMG
Assessment Works

From contract to live platform, here's exactly what happens

with a PMG assessment — four steps, one vehicle,

and no disruption to your team.

2

3

1

4

Project Kickoff

Project starts

Video Capture

A few days on-site

Data Processing

AI + human analysts

Project Delivered

RoadINsights goes live

Step 1

Project Kickoff

Once your contract is in place, we schedule a kickoff call within the first week. We pull your road inventory from your GIS data, walk through your network with you, confirm the scope, and set the video capture schedule.

→ Kickoff call scheduled within week one

→ Road inventory pulled from your GIS data

→ Scope confirmed and capture schedule set

PMG Truck - Madison County.jpeg

Step 2

Video Capture

A PMG employee drives every road in your network at the posted speed, with an external HD camera system mounted to the vehicle. Single operator. No equipment left on your roads. No traffic disruption.

All done by PMG.

→  Every road driven at posted speed

→  Single operator, external HD camera

→  Zero traffic disruption, zero staff time

Step 3

Data Analysis & Quality Review

Video is processed by our in-house AI to identify pavement distresses across 20 distress types per ASTM D6433. Then expert pavement analysts review every road segment before any score is published. Nothing goes to you without human review.

→  AI identifies 20 distress types (ASTM D6433)

→  Every segment reviewed by an expert analyst

→  Objective, repeatable, defensible PCI scores

Untitled design (24).png
RoadINsights marketing image.png

Step 4

Platform Delivery & Ongoing Support

RoadINsights goes live and all deliverables are handed over the same day: Excel data, GIS shapefiles, final assessment report, and full platform access. You're ready to use it immediately, and throughout your partnership, we're here to help support you.

→  All deliverables handed over the same day

→  Live platform + optional training

→  Ongoing program support from PMG 

ASTM Standards

How Our Condition Assessments Work

PCI (Pavement Condition Index) is the industry-standard scoring system (0-100) established by ASTM International. Every PMG score follows the ASTM D6433 standard.

All scores color-coded for instant understanding.

Untitled design (22)_edited.png

Excellent

PCI 90–100

Newer pavement in top shape. Monitor only.

Good

PCI 70-89

Preservation window — the cheapest time to act.

Fair

PCI 50-69

​Still in the preservation window — treat before it slips.

Poor

PCI 30-49

Overlay likely needed. Costs climb from here.

Failed

PCI 0-29

Reconstruction — the most expensive outcome.

100

85

70

55

40

0

Our QA Approach

AI Finds It.
A Human Confirms It.

Distress recognition is done by our in-house AI,

but every road segment is reviewed by an expert pavement analyst before any score is published.

In-House AI

Scans HD video and flags distresses across 20 types per ASTM D6433.

The Quality of Your Data Matters to PMG.

Analyst Review

Every segment is checked by an expert before a score is published.

Contract to RoadINsights
in as Little as
90 Days.

Schedule a demo and we'll walk you through

the process, the data, and the platform.

bottom of page